gsiso.ai
Five foundational documents — vision, technical architecture, go-to-market, the end-to-end delivery plan, and the Phase 0 kickoff packet — plus the reference architecture diagrams. Each is available as a rendered PDF and a source Markdown file. Everything here was written after deep research against the 2026 agentic AI landscape.
The 2031 thesis, the five pillars, the "why now", stress-tested against five future scenarios. An honest verdict on what must be true for gsiso.ai to matter.
The full five-layer reference stack — Agent Mesh OS, Physical AI Bridge, Trust & Governance, Self-Evolving Workflows, Vertical Packs — with protocols, data flow, security model, and interoperability.
Market sizing, competitive landscape, the two dateable differentiators, 2026→2031 roadmap, ICPs, GTM motion, risks & mitigations, and the 18-month plan with four go/no-go decisions.
The build plan, not the pitch. Locked tech stack across 10 layers, 5-phase 18-month roadmap, sprint-level Phase 1 detail, 14 hires sequenced, $12M budget, design-partner targets, and risk register with 10 mitigations.
The 60-day plan from May 9 to July 7, 2026. Week-by-week tracker, dev environment setup, Sprint 1 spec (MCP + ROS 2), four founding-engineer JDs, and three design-partner outreach emails (Recursion, Siemens, Two Sigma).
Five SVG diagrams embedded in the technical architecture document. Available standalone.